Photobucket Photobucket Photobucket Photobucket Photobucket
Showing posts with label Contractors. Show all posts
Showing posts with label Contractors. Show all posts

Friday, June 24, 2011

Weekend Pleasure: Holmes

Sometime last year, I discovered a great way to spend an early weekend morning. Not alone with my coffee and the dog, while everyone else slept in, but with this guy:

Overalls and a took belt, his usual attire.

For those of you who don't know who Holmes is, in my opinion, he's the best thing on HGTV. Mike Holmes is a contractor extraordinaire!!! He knows more than any contractor I've ever met working or seen on television. And, for the times he doesn't know something, he knows people that know. Yeah, talk about the ultimate fantasy guy to know. Currently he has two shows:  Holmes On Homes and Holmes Inspection. Both are entertaining and informative. Oh, and he has a magazine too. Something for the beach or pool bag?

Mike, that aqua shirt is so cool!

I found Holmes by accident when I was channel surfing looking for my other favorite contractor's: Norm, Tom and Richard aka the This Old House guys. It seems they had another schedule change and that's when I found Mike. Within 15 minutes, I was having a total love fest. Although, after making introductions to my husband, it's now a threesome. He says things like "let's fix this and make it right" and "let's rip this all out and start over". Makes me want to move to Canada. He points out all the things that bad contractors do without coming off arrogant.  And, despite his tough guy looks, he is seriously compassionate and very charming. I'd even say charismatic!
Cleans up pretty good, eh?

Both his son and daughter work for him, along with a great guy named Damon and many other very skilled craftsman. Each week there is a different disaster, courtesy of an incompetent and often
unlicensed/dishonest contractor. The distressed homeowners at their wits end enlist Holmes to find the problems and correct the mess. He always goes beyond what any "normal" contractor would ever do.  The ladies always hug him at the end and often the men do to....he's that good. Check your local listings for times!


You'll want to have a leisurely breakfast with this weekend pleasure. May I suggest pancakes. Extra syrup.

Tuesday, April 26, 2011

The Process Of Refinishing Hardwood Floors: Before and After

When we purchased our home in the fall of 1993 we had hardwood floors installed in the foyer, dining room and library. The stain was called Gunstock and it resembled cherry. In 2001 we removed tile and linoleum in the kitchen and laundry room and had the same flooring installed. We moved away for 4 years and when we returned in 2005 had the family room and living room completed. As soon as the floors were laid...I hated them. Except for the micro bevel, which felt so much better under foot. This version of Gunstock pre-finished wood flooring didn't seem all that similar. They were lighter and in the afternoon sun,  looked orange. The floor vents that were stained the same color practically glowed in some rooms! I was told they would darken over time like my other floors, but 6 years later that hasn't happened.  We finally got sick of waiting for ugly to fix itself! Even if we had been tolerate the color, the kitchen and laundry/mud room needed to be refinished. 
Before

After
Now the two different profiles aren't nearly as visible and the transition board bothers me far less. It was impossible
 to blend these two spaces without laying new floors in one whole room. Given the savings, we can live with it!
It was dark and raining when I took this picture it and doesn't quite reflect the actual color.
So after nearly 6 years of looking at orange floors, damaged wood in the kitchen (where renters had let the dishwasher leak for days before calling the property manager) fading from the sun and 2 different profiles (standard bevel and micro bevel) I was so excited to finally get this project done!
Before
 When the light comes in through the french doors, the floors look so awful.
The broken vent is such an awesome designer touch, don't you think?
 Without a doubt the most hideous and shameful part of our house! 

Before close up of damage hidden under the mat.

After close up!

After!
 This was a truly remarkable transformation in this area. About 8 boards were replaced. In addition, the threshold for the french doors (installed last spring) was finally stained and the black plastic protector removed at last.
 The doors are by Pella with UV protection and have an Energy Star rating. 
The preparations:  Move everything! Furniture, artwork, accessories and rugs. As well as the washer, dryer and mud sink. I left the books in the bookcases and the horse prints hanging in the dining room. The crew covered them in plastic. We did all the moving ourselves (getting help only with the dining room buffet which is mahogany and a large capacity front loading washing machine) and though it was a lot of work, we saved approximately $800! Stuff went into the garage, upstairs in my office, the master bedroom and the rest went in the basement. For those of you who have a ton of accessorises...now is the time to seriously edit yourself. Otherwise, schedule a therapy session and have plenty of your favorite elixir handy! Plan on at least two days for this part.

Day One:  Floors are sanded on the entire main level of the house.  Removal of carpet and pad in upstairs hallway and wood cut and installed for a new floor there. Carpet and pad removed from existing stairs and new wood steps and risers installed. Each one had to be cut because I have an enclosed staircase and surprise....the walls weren't straight. The crew vacuumed the floors. At this point, I have brief moment where I want to keep the floors just like this and wish I had a beach house or cottage to try it out!!!

The range of colors in red oak is so apparent when in their natural state. The stain I chose is dark, but still shows all the colors from red to ebony and as well as the many beautiful brown tones. It also highlighted all the grain variations that were barely visible before. Some of the boards remind me of a tiger's stripes and I just love that detail!
Day 2:  Sand everything again. Getting down to the bare wood in the kitchen was difficult. My guess is the result of a combination of the water damage and the build-up from various cleaning products used over the years. Vacuum again. Replace damaged floor boards in kitchen. This should have been completed on day one, but they brought the wrong profile to blend properly.

A small sander is used for the perimeter. Goodbye orange!
 Day 3: Apply the stain in the morning. I thought I was going to have to go with a custom blend (which costs more as do darker stain colors), but the red oak has so many natural color variations, it wasn't necessary. The stain is called Spice Brown. Think coffee, chocolate and just a hint of cinnamon! Let dry for hours and come back later to apply the sealant.

After the stain, sealant and first top coat of satin finish. When it's wet it looks like high gloss.

Day 4: Apply the thresholds upstairs and shoe molding downstairs. Vacuum, buff and apply first coat of satin finish. Discover later that night, the crew took a little shortcut in the laundry/mud room and "forgot" to mention it to me or the owner of the company!
The difference in floor color is really apparent here. Guess they thought since it was under the bench we wouldn't
notice???  I love a striped wood floor, but two-toned? Uh....no thanks!

All Fixed!? Hardly, now it looks like water damage!!! The solution: start over and sand the whole room.
This is one of those times when contractors are so perplexing. Why would they do great work everywhere else, then take a shortcut at the end and cause delays and more work for everyone.  Not to mention get everyone really irritated.
After, That's more like it!
Day 5: Remove one threshold and 3 sections of shoe molding I don't like. Stain and re-install. Sand and apply second coat of finish in the morning. Apply third coat later in the day. Discuss laundry/mud room issues and after hearing excuses, such as they don't have a machine that fits under the bench, I suggest they do it by hand or find a tool that will fit. They look at me like I'm nuts, but say they will fix it. Find out later, they made it worse as shown above.

My husband and daughter(who was on spring break) return home from a little vacation. Right away he notices the problem in the mud room. I place a call to the owner and explain that it has not been remotely fixed. We schedule a meeting with the owner to come and look at the room Saturday morning. Naturally he doesn't like to hear there are problems. Problems equal delays. Delay of work equals delay of payment.

I am so happy that my husband and daughter are home, but the dog's vacation has to be extended due to the screw up. I have been living in the basement and note that my efforts to make it a really comfortable and functional space have paid off.  But, after being in "lockdown" for days I decide a small refridgerator and microwave would be good additions. I am seriously sick of Chipotle's Carnitas Salad. It seems there really can be too much of a good thing.
Here we go!  The week before, the new wood is delivered for the upstairs hallway.

Day 6: We meet with the owner of the flooring company in the morning. He agrees the work under the mud room bench is unacceptable and says they will need to re-do the entire room. UGH!  I am not surprised and feel good about a referral arrangement for the future. Remember in my previous post I said when final payments are pending and there is a problem, resources and a resolution will happen sooner rather than later? In this case they had to purchase two new types of sanders, including one used for radiators. The crew worked all day Saturday! 

New floor in the upstairs hallway. Smooth as silk, but I am going to add a gorgeous runner
that my husband brought home from his travels.
Day 7:  Apply second coat to laundry room. Come back later sand, vaccum, buff and apply final coat.

Day 8: The crew returned today to put the washer and dryer back in the room. Officially done!!!!!!!!!! The floors are 100% better and I am so happy with the outcome. Time to make that final payment and get busy tackling all that laundry...sigh.

Before

After
I wish my camera could truly capture the depth and richness the floors now have after this process. 
 What I Learned: I was reminded that you can still work with a seemingly good contractor and experience  bumps along the way. For those of you like me that have endured renovations before, know that only in rare situations do things go off without a hitch. This flooring company has been in business for more than 20 years and also does retail spaces. Even so, they learned there are still situations yet to be tested and short-cuts are never the solution! We all learned something on this job and I consider that a bonus.

Regarding the dust.... I knew there would be a mess, but it was still worse than I anticipated. Even with the dust containment system, which looked like a hot water tank on wheels, it took hours to wipe down the walls, doors and moldings. I also knew there would be paint touch ups, but far more stain got on the door jambs and staircase wall than I had imagined. Significant painting was not something I had figured into my budget.

What I Would Do Differently: I would have made the installation of the new steps (a post for another time) and hallway a separate project to be completed at another time. It would have made things far easier logistically and I wouldn't have been as confined to the basement. For those of you without a finished basement, you are probably going to want/need to find acccomodations for at least part of this process.

I had plenty of reading material, and certainly watched way too much television. Chatting on the phone with friends also helped pass the time.  However, I stupidly told my husband he could take the laptop. Imagine being unplugged for days and you're not on vacation or busy...super annoying. On the morning of day two I was greeted with a dead car battery and was freaking out that I couldn't escape to Starbucks!  I quickly regretted that I didn't think to put my coffee maker downstairs. I had to wait till the middle of the day to retrieve it!  Between no java and the smell of the varnish, I had one big ass headache. Even with low voc products, there is a smell. And on the days it rained...worse! Fortunately, I always have Advil and Imitrex in my purse.  Bottled water, Laughing Cow cheese and crackers were the other mainstays of my meals.  Sad, I know, but a small price to pay for gorgeous floors!

Wednesday, April 20, 2011

Contractors: The Good, The Bad and The Shrugger

Not all contractors are created equally and based on my experiences, they seem to fit into three categories.

The Good: Every homeowner and designers dream. They come with good references from happy clients. They are polite, professional, friendly and respectful of you and your home. They provide detailed proposals and outline the schedule of work to be performed. They discuss issues and concerns with you as they arise and work with you to find a satisfactory solution. They show up on time and call when there is going to be any significant delays on your job. They tidy up the job site and remove all trash and debris daily....without being asked and of course, do quality work!



The bad: We've all had these experiences to varying degrees. Things that will alert you to problems could include any or all of these. The contractor who doesn't look you in the eye when talking, is dismissive or condescending. Communication is difficult and information must be dragged out of them with multiple questions and/or every detail must be painfully extracted. Specifically, they provide no information without being requested to do so.


They come unprepared and ask you for things like towels/rags, step ladders or tools! They either have them in their truck and are too lazy to retrieve them or they didn't bother to stop and get the items necessary to do your job. Direct them to your nearest hardware store. If you provide supplies this will set the tone for the whole job. I have even had contractors ask me for water and to use my microwave, hardly appropriate for someone you just met! I have been asked to go out and get food when contractors are running behind. Don't cave in! Politely direct them to where food sources are and the hardware store...to buy a cooler.

They are not respectful of your home,  neglecting to take proper precautions to cover surfaces such as floors and furniture. There are surprise costs at the end. They don't show up on time or leave early. They take multiple or extended breaks. They tell you you don't need permits and/or inspections. Huge red flag!!! Even if everything else seems great, if they say this...walk away and move on.

The Shrugger: These guys are tricky. Sometimes they are good and sometimes they are bad. We all shrug from time to time and usually it means one of three things: we are perplexed, we are thinking of a solution or we don't know or care. In contractor speak it can mean any of these things or it can mean "I'm not committing" to what you are saying. So if you took the shrug to mean the first three possibilities and there is a problem, you're going to hear "I never said we could or couldn't do (fill in the blank)". CYA (cover your ass) and nail them down for a response and note it on the  proposal and have them initial it.


Here's what you need to do before you began any project to try and ensure the smoothest possible scenario in the absence of a GC, project manager and/or designer:
  • Get multiple quotes from a variety of GC's or sub-contractors. This step alone will teach you a lot!
  • Communicate effectively the scope of the work that you want to complete and stick to you original plan. If things are modified after the initial contract, you and the GC need to sign an amendment/change order.
  • Obtain a detailed proposal. If your contractor does one price and you are going it alone, I suggest you know how much basic supplies are (a sheet of drywall, 2x4's, etc...) to determine if things seem in line for the scope of your particular job. If you're still not comfortable ask for it to be broken down by supplies and labor. Note: contractors do not like to do this.
  • Let them know you don't provide food, water and supplies and expect them to come prepared. 
  • Talk about schedules. What time they will arrive and depart daily as well as the estimated completion date. Will they being doing other jobs simultaneously?
  • When they arrive, make sure the job is prepped properly. If you don't think it is, speak up!!! Otherwise, make sure you know what any possible claim process will be.
  • If you don't understand something or something doesn't seem right cease work immediately and make the appropriate calls.
  • Will they use your bathroom? If so, designated the one you prefer! If not, make sure a company vehicle is left for them to use. Does anyone on the crew smoke? Where should they dispose of butts/ashes?
  • Where do you want the trucks to park? On your driveway or in front of your house? Tell them specifically. Make sure they don't block your mailbox. Minimum code, in most areas, is 25 feet.
  • Pull inspections for everything. Make sure you have the proper permits filed. If you don't you may find yourself in trouble from a neighbor who reports unauthorized work or you may get a nasty surprise in the form of a property tax assessment and/or bill when you go to sell your home.
  • Check references, your county/city licensing division and the BBB for information about your contractor. Ask them to see their credentials and photos of their work.
  • Never pay in full up front. Large jobs should be spit into three payments. The first payment is your good faith. This secures you a place on their schedule and covers the costs of supplies. The percentage is something that is worked out with the GC or project manager and you. Smaller jobs will be split into two equal payments, in most cases.  Do not make final payment until job site is thoroughly cleaned and you are satisfied with all work. And never let a contractor say no problem we'll fix it this week, but I still need to collect the final payment. Final means final...for all parties! If they want final payment they will "find" someone on their crew to remedy whatever you are unsatisfied with sooner rather than later.
Above all trust your gut instinct before you sign any contracts. If if doesn't feel right, chances are it's not.

Next week the before and afters of the floors. The weather didn't cooperate as much as we had hoped and it took forever to get the original stain off the kitchen floor. They be will back working today and tomorrow and by Friday evening everything should be dry and looking beautiful and I'll have pictures to show next week!

All images via Google.

Friday, April 15, 2011

Gearing Up For A Messy Weekend!

Over the past few months I have been interviewing contractors and getting bids for work to be done in my house. Then I got sick...was it related? In conjunction, I am scouting out new relationships for client work. A few of my favorite contractors are no longer available. One got engaged and left the area, the other is going to work for a builder full time and one that I really liked seems to have vanished from everyone's radar!

Existing stain and glossy finish removed exposing natural red oak floors.

I still have relationships with tiler installers, a wallpaper hanger, a plumber and an electrician, but I needed to fill in the big gaps for construction (which would include skilled carpenters, masterful drywall hangers and experts in hardwood refinishing and installations) for projects that are larger or trade intensive like bathrooms. I mentioned last year in this post, that I  try to test drive contractors before recommending them to a client or friend. One thing that has changed since then? Now I never recommend trades that I have not test driven! Either I have worked along side them on a job (where the client has hired them) or they have worked in my house. There are many more factors to consider when hiring/working with someone than "does it look good?". When things go wrong and you gave the reference, understandably, the clients are going to be upset with you. So.....the painful reality is in order to run my business as efficiently and effectively as I would like, I needed to take the time do this. Plus, I love renovations, definitely a highlight of design work for me. It has been a long process, but I am excited about the possibilities it will create.

 The results of floors added at 2 different times with different profiles.  You can also see how light plays a role.
The one on the right is original. The one on the left had the same stain applied, but is only about 5  years old.
 I prefer the richer tone of the one on the right. However, the one on the left is far more comfortable in bare feet.
 Both issues will be addressed!
Some clients have their own preferred general contractors with whom they have worked with before. Many do not. And, this fact is often what keeps homeowners from moving forward on a project or letting one evolve into it's full potential. Clients/homeowners may find a project like a master bath is too big to handle finding the trades necessary on their own, but too small (or unnecessary) to need a team (architect/builder who bring the GC/trades) to execute. That's where a designer can assist with moving a project forward and even elevating it to a higher level in both design and workmanship, particularly if experience and a contractor relationship exists. Next week, I will do a post based on my experience, which to date includes:
  • 2 kitchen renovations (mine and one client) 
  • 9 bathroom renovations (2 at my house, 7 for clients)
  • 1 new construction basement (my house)
  • 1 new construction bathroom (my house)
  • 1 basement renovation/addition (client)  
  • 1 new construction brick/flagstone walkway and porch (my house) 
  • 1 laundry room remodel with custom bench/shelving/cubbies (my house) 
and outline what I think is important to look for when hiring a contractor. In the meantime, I'll be keeping busy removing every possible thing from each room to prepare for the floors to be refinished on the entire main level, plus have hardwood flooring added to the upstairs hallway and repair/removal of damaged floor boards in the kitchen.

A crew member applied my test sample choices yesterday morning!

Even though this process has come a long way and despite what is often advertised, there is absolutely no such thing as a "dustless" process!!! It's going to be a messy and exciting ride...I'll be sure to bring you along!

Saturday, March 27, 2010

Contractors: When Things Go Wrong

This was one of those very challenging weeks where things didn't go as planned. I had to fire a contractor and that is always an unpleasant event.  Let's face it, without contractors a designer can not do their job.  The vision we have for a space, the ideas we propose to clients require skilled individuals to execute.  They are  key players in what I fondly refer to as my trio.  The trio consists of the client, the contractor and me.  Often I am working with the contractor the client has selected.  In other situations, I will recommend a particular contractor that I am very confident in their professionalism and abilities.  In most cases, they have been test driven...in my home!  Or, I have seen their work in person.  And sometimes, even this is not enough.
Case in point.  This past week I had to fire the painting contractor off the job for the client whose closets I am re-doing.  Here's a recap.  The painting was suppose to start a week ago, but the day before Mr. Painter called to say they were running behind on another job, could they push it to next week?  I called my client she said okay even though she had already emptied out 5 closets.  This past Tuesday, the painter I had "sold" her on showed up on time with 2 other men.  He then instructed one man about the work to be done and left.  She callled me to inquire if I knew this, because other than to introduce himself he did not speak to her.
I immediately called Mr. Painter to inquire about the situation and he replied "She is getting me, because he is my guy and I am the best and therefore she is still getting the best!"  My response, besides difficulty comprehending the arrogance I had not previously been exposed to, was to say "Well I sold you and this has taken us both by surprise, so I will trust what you are saying."  After this statement, I was trying to talk to him and he kept talking over me and said he had to go to another job, but would be a "good boss" and check my job later. Ok. Fine. I called my client and told her that the man at her home is one of his employees and he assures me will do an excellent job.  I have worked with this client before.  She trusted what I said.

Later that evening, I received another call from my client saying she was unhappy with the work.  There are drips, holes that were not filled, nail pops not fixed, and shelves that had previously been covered with a paper not sanded.  Oh, and Mr. Painter did not come back to check on the work/progress.  All things I had emailed as well as discussed with Mr. Painter ahead of time!  I called him and said "I think we have a few problems over at...." and began relaying the concerns.  More talking over me, some profanity and then "they're closets!" and I said "that makes no difference, she is paying for a professional paint job!"  I then began to try to explain to him how it is very important for me to manage the expectations of each client and job, still thinking he would apologize and say I will take care of all the issues personally and not to worry.  He did not say any of those things, but instead  said "get to your point, I don't have time for this!"  I said  "Ok.  Here is my point...your fired."  Silence.  And then he said, "Are you @#$%@&#.....kidding me?  No one has ever fired me off a job and you're not even giving me a chance to fix it!"  I said ,"You have had two conversations worth of chances to say the right things and be professional and you have chosen not to.  He then asked me not to share this with a couple via me he had just quoted work for.  I said I can not promise that because I do not  think you are the right painter for them either.  He then said, "Oh, so now your trying to take business away from me?"  My reply, "These are people who I have known for 15 years, I care about them.  Without my recommendation, the business would not have been yours to quote."  I then said, "It is regrettable our relationship is ending on a sour note and that I am sorry to have ruined your evening."  He said, "You didn't even ruin my day because I just bought a brand new Ford F-150 with Harley Davidison (something or other) and it was a great day!"  We hung up and just then it occured to me....there was no other more important/difficult painting job.  He had lied.

I immediately got on the phone trying to line up my favorite contractor to beg for a favor.  Yes, that is what a good designer should do for their clients in my opinion. We spoke and he said he could work me into his schedule for Thursday and Friday, but he would have to put 3 guys on it and I would need to make sure all the paint is there.  Whew, I had  been saved!!!   I called my client and said " Mr. Painter has been dismissed from the job and a new crew of 3 will be there on Thursday.  She said "Thanks, this is such a relief."   I met my contractor's painter that morning, to go over the details of the job.  I was on time, he was early.  When I was walking toward the house he came down the driveway to greet me, then grabbed my client's trash bin from the curb, as well as the gallon of paint I was holding, and put the bin in her garage.  The first closet we got to, he pointed out all the things that needed fixing.  This was going to be a very good day.  I made the right decision for both of us. I always notice these little gestures and details.  They often provide me with everything I need to know!

This situation definately took time away from blogging, so please excuse the lack of posting. I have been planning to do a post on contractors....just not this one!   I will eventually do one that outlines key elements of what I think you need to know and look for when hiring contractors based on my experiences as a designer and homeowner.

images courtesy google